Installation

Our end-to-end build process takes care of the complete installation, structural certification and final removal of all hoarding components when your project reaches the completion stage.
Your complete hoarding solution includes:
- The supply of all consumable materials
- Transport to and from site
- All labour required
We are available 7 days-a-week to fit in with your specific project needs.
We offer competitive rates, pre-install hoarding design drawings and post-install compliance certificates.
The Lomax System is fast to install, completely free-standing and since no bracing is required at all, there is no damage caused to any surroundings when removed.
The Lomax System offers a range of possible freestanding configurations all with the engineering certification and compliance required:
- Indoor Hoardings: 1.2mH to 8mH
- Outdoor Hoardings: 1.2mH to 4mH (multiple wind speed options)
Downloads & Resources

Call Phil on
0412 502 655
or enquire online
Proudly servicing businesses throughout
South Australia
South Australia