Installation

Our end-to-end build process takes care of the complete installation, structural certification and final removal of all hoarding components when your project reaches the completion stage.

Your complete hoarding solution includes:

  • The supply of all consumable materials
  • Transport to and from site
  • All labour required

We are available 7 days-a-week to fit in with your specific project needs.

We offer competitive rates, pre-install hoarding design drawings and post-install compliance certificates.

The Lomax System is fast to install, completely free-standing and since no bracing is required at all, there is no damage caused to any surroundings when removed.

The Lomax System offers a range of possible freestanding configurations all with the engineering certification and compliance required:

  • Indoor Hoardings: 1.2mH to 8mH
  • Outdoor Hoardings: 1.2mH to 4mH (multiple wind speed options)

Downloads & Resources

Lomax™ System Product Brochure

Lomax™ System Technical and Installation Guide

Call Phil on
0412 502 655
or enquire online

Proudly servicing businesses throughout
South Australia

No files currently addedAccepted file types: jpg, jpeg, jpe, gif, png, mka, pdf. Max. file size: 10 MB